Hello,
I have a relatively large job array that I launched yesterday that was still running.
However, I have another job that required a higher priority, and as such I used scontrol hold jobid
to pause those jobs, so the new jobs could go through.
Currently, though, I am unable to resume those held jobs. Is this the expected behaviour?
For posterity, if such a situation does arise, what is the recommended procedure?
Relevant jobid that was paused: 6767423_